Address
27 Adrianothiron str., 172 37, Imittos, Attiki, Greece
Phone
+30 210 9730514
Installation, testing and commissioning of the Overhead Catenary System (OCS) for the new Tithorea–Domokos high-speed railway line. The scope of works also included the installation of signalling cables and trackside equipment, construction of signalling cable trenches, electrical works related to the signalling system, as well as the construction of cable routes and restoration of low-voltage cables.
Address
27 Adrianothiron str., 172 37, Imittos, Attiki, Greece
Phone
+30 210 9730514