40 km of signalling, full scope (turnkey): restoration and upgrade of the signalling and Overhead Catenary Line (OCL) systems on the Domokos – Krannonas section.
Works included new cable trenches, cable installation and termination, trackside equipment installation and commissioning, as well as dismantling of existing OCL equipment, construction of new foundations and installation of the upgraded catenary system.